Projects
The
following descriptions provide a brief sampling of the types of
projects our consultants have completed. For more details about
a particular project or to request references, contact
us.
To
view descriptions of a particular type of project, use the links
below.
 |
 |
 |
Technology
Planning Projects
|
 |
| |
 |
|
|
| |
|
|
|
| |
|
|
Technology
Assessment and Plan |
| |
|
|
|
| |
|
|
Client:
Very large school district |
| |
|
|
|
| |
|
|
Project:
Review the status of technology used by a very large
school district in Texas (including all schools and
support facilities) and create a report of the findings.
Following the assessment, work with the district to
create a ten-year technology plan.
|
| |
|
|
|
| |
|
|
Solution:
Through a series of interviews, focus groups, and site
reviews, a team of E&A consultants created a very
extensive background analysis of needs related to upgrading
technology throughout this district of 60,000 students
and 70 buildings. The plan included budget estimates
and was used as a foundation for all future improvements
involving technology.
|
| |
|
|
|
|
| |
| |
|
|
Distance
Education Network Rebuild Plan |
| |
|
|
|
| |
|
|
Client:
Technical college |
| |
|
|
|
| |
|
|
Project:
Develop a plan to completely revamp and upgrade the
distance education network for a six-campus college
in Wisconsin, replacing an aging ITFS system.
|
| |
|
|
|
| |
|
|
Solution:
E&A's recommended solution resulted in a design
to upgrade to a new QoS-based WAN utilizing multiple
T-1 circuits, 30 codecs, and an IP-based MCU. The installation
was planned and then executed during the summer months,
to allow training on the technology during the college's
down time.
|
| |
|
|
|
|
| |
| |
|
|
Technology
Upgrade Assessment |
| |
|
|
|
| |
|
|
Client:
Healthcare center |
| |
|
|
|
| |
|
|
Project:
Conduct a technology analysis, with a focus on upgrading
existing facilities, including wireless, multimedia,
access to records, security, and video conferencing.
|
| |
|
|
|
| |
|
|
Solution:
Through an extensive interview and inspection process,
E&A evaluated the network and telecommunication
in this health care facility and provided a report of
findings and recommendations for administrative planning
and budgeting. The recommendations included plans for
in-building wireless, desktop conferencing, enhanced
network security, and remote access for staff.
|
| |
|
|
|
|
| |
| |
|
|
Business
Continuity/Disaster Recovery Plan |
| |
|
|
|
| |
|
|
Client:
National communications firm |
| |
|
|
|
| |
|
|
Project:
Develop the technology portion of a recovery plan for
a national communications firm, with a focus on its
switching centers.
|
| |
|
|
|
| |
|
|
Solution:
E&A conducted on-site visits at multiple locations
throughout the United States and facilitated in-depth
interviews of technical staff. Using this information,
we developed a formal report of findings and system
recommendations related to the communications strategy.
|
| |
|
|
|
|
| |
 |
 |
 |
|
 |
| |
 |
|
|
| |
|
|
|
| |
|
|
Cabling
System for County Government Support Building |
| |
|
|
|
| |
|
|
Client:
County government |
| |
|
|
|
| |
|
|
Project:
Develop a plan for all telecommunications cabling and
fiber optics systems to support a new three-story office
building for a Minnesota county.
|
| |
|
|
|
| |
|
|
Solution:
E&A consultants provided a complete design, bid
documents, and contract administration for this building,
and created a system to offer a flexible voice, video,
and network distribution system meeting EIA/TIA-568B
standards.
|
| |
|
|
|
|
| |
| |
|
|
Smart
Classroom and Cabling System Infrastructure Design |
| |
|
|
|
| |
|
|
Client:
University |
| |
|
|
|
| |
|
|
Project:
Develop specifications for a complete low voltage wiring
system for two new classroom buildings, in addition
to smart classroom technology for all lecture spaces
at a Missouri university.
|
| |
|
|
|
| |
|
|
Solution:
E&A created specifications for the infrastructure
system. As a second project for the same university,
E&A designers created a fiber, coax, and Category
5e cabling system, plus a custom design for smart classrooms.
The project was bid and interfaces established to ensure
successful integration with campus systems.
|
| |
|
|
|
|
| |
| |
|
|
Residence
Hall Technology Upgrade |
| |
|
|
|
| |
|
|
Client:
University residence hall community |
| |
|
|
|
| |
|
|
Project:
Review the technology infrastructure necessary to support
a student residence community at an Illinois university
(a $4 million project).
|
| |
|
|
|
| |
|
|
Solution:
E&A consultants conducted a complete review of the
campus's technology infrastructure needs and created
detailed bid specifications for the project. The resulting
project included a complete campus delivery system of
fiber optics and a residence hall television headend.
The work covered two summers, to reduce the impact on
students. Every student room was provided a voice, two
data, and one television outlet. The new television
headend and system allowed the campus a fifty percent
reduction in television signal costs.
|
| |
|
|
|
|
| |
 |
 |
 |
|
 |
| |
 |
|
|
| |
|
|
|
| |
|
|
Community-Wide
Fiber Optics System |
| |
|
|
|
| |
|
|
Client:
Private residential community |
| |
|
|
|
| |
|
|
Project:
Design a community-wide fiber optics broadband delivery
system offering voice, video, and high-speed Internet
services to homes, apartments, and public areas, plus
a theater and community room multimedia system.
|
| |
|
|
|
| |
|
|
Solution:
E&A created a design for the system, which consists
of an on-premise voice switch, television headend, and
Internet provisioning. The multimedia theater has fixed
seating and offers surround sound, touch screen control,
and even a snack station.
|
| |
|
|
|
|
| |
| |
|
|
Metropolitan
Area (Fiber) Network |
| |
|
|
|
| |
|
|
Client:
Large school district |
| |
|
|
|
| |
|
|
Project:
Design a broadband inter-district MAN to support voice,
video, and data for a Texas school district (a $2+ million
project).
|
| |
|
|
|
| |
|
|
Solution:
E&A designers created a fiber optic network with
a distribution point at each high school, interconnecting
fiber to all other buildings. Bid documents allowed
for either a leased or owned network, resulting in a
multi-year lease with very favorable terms.
|
| |
|
|
|
|
| |
| |
|
|
Wireless
Network Grant and Construction |
| |
|
|
|
| |
|
|
Client:
City community |
| |
|
|
|
| |
|
|
Project:
Develop a grant for a wireless community network in
a Texas city.
|
| |
|
|
|
| |
|
|
Solution:
E&A developed the grant for the network, which was
proposed to provide DSL-like services to local businesses
and organizations. After writing a successful grant,
E&A then began an RFP to contract with a company
to create the necessary infrastructure. The selected
solution was a wireless ISP providing 20 Mbps services
to two areas (each one a 5-mile radius surrounding a
water tower).
|
| |
|
|
|
|
| |
| |
|
|
City-Wide
MAN and Building Technology |
| |
|
|
|
| |
|
|
Client:
City and school system |
| |
|
|
|
| |
|
|
Project:
Develop a Metropolitan Area Network (MAN) to serve the
city and school system in a growing Minnesota community.
|
| |
|
|
|
| |
|
|
Solution:
E&A consultants developed a fiber optic MAN connecting
19 buildings and associated in-building LANs to offer
staff and students the opportunity to share voice, video,
and computer networks anywhere within any building.
In addition, the network will be used to interconnect
traffic lights, the local college, and security cameras,
with little concern over bandwidth.
|
| |
|
|
|
|
| |
 |
 |
 |
|
 |
| |
 |
|
|
| |
|
|
|
| |
|
|
VoIP
Telephone System |
| |
|
|
|
| |
|
|
Client:
Large school district |
| |
|
|
|
| |
|
|
Project:
Develop a Voice-over-IP (VoIP) system to support over
1,100 phones, operating via an existing fiber optic
MAN supporting 24 buildings.
|
| |
|
|
|
| |
|
|
Solution:
E&A developed a complete design for the system.
We then coordinated the bid process, which allowed the
district to acquire the services of a qualified contractor
at the lowest price. E&A then oversaw installation
and cutover of the new system.
|
| |
|
|
|
|
| |
| |
|
|
Technology
Systems Design for State Lab Building |
| |
|
|
|
| |
|
|
Client:
State government |
| |
|
|
|
| |
|
|
Project:
Design a technology system (including voice, network,
all low-voltage wiring systems, multimedia, and wireless)
to support operations in a new laboratory building in
a Midwestern city.
|
| |
|
|
|
| |
|
|
Solution:
E&A created a design using AIA standard procedures.
We have also created all necessary bid documents for
the project, to offer a fully integrated technology
solution.
|
| |
|
|
|
|
| |
| |
|
|
Administrative
Center Phone System |
| |
|
|
|
| |
|
|
Client:
Nonprofit organization |
| |
|
|
|
| |
|
|
Project:
Design a new phone system to meet all the voice needs
of the organization's administrative center (including
local and long distance calling, call center, voicemail,
and in-building paging).
|
| |
|
|
|
| |
|
|
Solution:
E&A's project design team met with the administrative
and planning team to discuss options for the new center.
We developed a design and then wrote and released an
RFP. After the organization awarded a contract, E&A
was on-site during installation to ensure a successful
cutover.
|
| |
|
|
|
|
| |
 |
 |
 |
|
 |
| |
 |
|
|
| |
|
|
|
| |
|
|
Distance
Learning Network |
| |
|
|
|
| |
|
|
Client:
School district |
| |
|
|
|
| |
|
|
Project:
Establish a means of interconnecting two high schools,
an alternative high school, and a local consortium. |
| |
|
|
|
| |
|
|
Solution:
This project involved creating three distance learning
rooms capable of using either a local consortium T-1
network or the school's fiber network to intercommunicate
and share instructional resources. The previously installed
fiber optic MAN, in combination with a state-offered
T-1 service, created an individualized custom network. |
| |
|
|
|
|
| |
| |
|
|
Special
Events Center |
| |
|
|
|
| |
|
|
Client:
Very large school district |
| |
|
|
|
| |
|
|
Project:
Provide the technology program and design consulting
services for an 8,000-seat special events conference
center and arena. |
| |
|
|
|
| |
|
|
Solution:
The 190,000 square foot multi-use building was designed
to serve the needs of the school district and the community,
and will accommodate the area’s convocations,
sporting events, special event performances, teacher
in-service activities, and national and regional tournaments.
The facility includes an 8,000 square foot ballroom
that is divisible into eight smaller meeting rooms,
a 125-seat tiered lecture hall, and additional meeting
and conference rooms. Technologies include the sound
system for the main arena, a color LED video matrix
scoreboard, meeting room audio/video systems, video
production and broadcast connectivity, and a unified
control system for all technologies. The facility’s
main equipment room also serves as a district-wide hub
for the metropolitan area network. |
| |
|
|
|
|
| |
| |
|
|
Television
Studio and Editing Suite |
| |
|
|
|
| |
|
|
Client:
School district |
| |
|
|
|
| |
|
|
Project:
Design a complete television studio system, editing
bay, and multimedia system, including interface with
the architect to create all physical facilities. |
| |
|
|
|
| |
|
|
Solution:
E&A created a design using the latest in digital
technology, with upgrade capability built in. |
| |
|
|
|
|
| |
| |
|
|
Residence
Hall Television System |
| |
|
|
|
| |
|
|
Client:
Large university |
| |
|
|
|
| |
|
|
Project:
Work with a university to replace its residence hall
television system. In doing so, also educate the university
staff and handle the bid process for procurement. |
| |
|
|
|
| |
|
|
Solution:
E&A conducted a training session with university
staff, coordinated a search for alternatives, and determined
the available solutions. We then worked with the university
to select a plan of action. E&A developed an RFP,
and the bid process resulted in selecting a contractor
to provide and install a private cable operation that
the university now operates. |
| |
|
|
|
|
| |
| |
|
|
City
Council Chambers Upgrade |
| |
|
|
|
| |
|
|
Client:
Local government organization |
| |
|
|
|
| |
|
|
Project:
Establish a plan to upgrade the city council chambers,
with a focus on better sound, graphic presentation,
and television broadcasts via cable TV and streaming
at a large city in Illinois and another in Minnesota. |
| |
|
|
|
| |
|
|
Solution:
E&A created a program report and submitted a final
detailed design, which was approved by the full council.
The bid was let and a vendor was selected to complete
the work. E&A conducted regular site visits to ensure
that the program was completed as planned. |
| |
|
|
|
|
| |
 |
 |
 |
Security
& Public Safety Projects
|
 |
| |
 |
|
|
| |
|
|
|
| |
|
|
Security
Analysis and Plan for a Water Treatment Plant |
| |
|
|
|
| |
|
|
Client:
Large city |
| |
|
|
|
| |
|
|
Project:
Conduct a vulnerability assessment and create an emergency
operations plan for a water treatment and distribution
facility in a large city.
|
| |
|
|
|
| |
|
|
Solution:
E&A consultants were awarded the contract to complete
the assessment and plan. In the assessment, we used
Sandia Labs methodology to focus on threats, consequences,
critical functions, and potential attacks to public
systems. The plan offers the city a detailed series
of steps to move towards a more secure environment.
|
| |
|
|
|
|
| |
| |
|
|
Electronic
Jail Visitation System |
| |
|
|
|
| |
|
|
Client:
County government |
| |
|
|
|
| |
|
|
Project:
Develop a video-based jail visitation system customized
to the needs of a particular county in Wisconsin.
|
| |
|
|
|
| |
|
|
Solution:
E&A developed a system that replaced face-to-face
meetings through glass with a system of cameras, monitors,
and phones, thereby reducing staff needs and enhancing
security for the jail. The system also allows an incarcerated
person to be arraigned before a judge for his or her
initial appearance without a guard transporting the
individual.
|
| |
|
|
|
|
| |
| |
|
|
CAD/RMS
System Design |
| |
|
|
|
| |
|
|
Client:
Large Midwestern county |
| |
|
|
|
| |
|
|
Project:
Create a common system approach to serving multiple
communities with a single, cohesive Computer Aided Dispatch
system for all emergency services county-wide.
|
| |
|
|
|
| |
|
|
Solution:
E&A consultants are presently in the planning and
acquisition role to create the CAD/RMS system. The planning
includes necessary interfaces to all existing systems
and an upgrade path for the future.
|
| |
|
|
|
|
| |
| |
|
|
Library
and Technology Center |
| |
|
|
|
| |
|
|
Client:
Community and technical college |
| |
|
|
|
| |
|
|
Project:
Develop a technology plan for a new building to support
a library and technology center.
|
| |
|
|
|
| |
|
|
Solution:
E&A developed a technology plan for the new building,
created detailed construction documents for the project,
and later provided contract administration for security
and other low-voltage infrastructure, including multimedia.
|
| |
|
|
|
|
| |
|
 |